ACE Method: Regular Maintenance

Regular
Maintenance

Weekly maintenance

1

Test the water with a FreshWater Salt Test Strip.

2

The pH level may increase during the first few weeks after start-up. Add pH down if needed.

3

Adjust the Use Level, if needed, to maintain 1-3 ppm chlorine.

Monthly maintenance

1

Test the water with a FreshWater Salt Test Strip.

2

Ensure water is balanced and re-confirm Use Level via the control panel. Make adjustments if needed.

3

Shock the water with bottled chlorine to 5 ppm.

Quarterly maintenance

1

Inspect the ACE cell for calcium and clean as needed.

2

Lower hardness of water with the Vanishing Act Calcium Remover, if needed.

3

Clean spa cover with Cover Care & Conditioner.